The construction of the Modulo Sperimentale Elettromeccanico (or MOSE) that is meant to be raised in times of high water started back in 2003 [2].
[1] http://www.geotimes.org/mar04/geophen.html
[2] http://en.wikipedia.org/wiki/MOSE_Project